Prof Aoife M. Foley Verified account @AoifeMFoley
Great article but Ireland’s energy transition: the wolf in sheep’s clothing 🧵

1/ Wind and solar are essential, but weather-dependent. Nuclear can provide firm, low-carbon power. A resilient grid needs a balanced mix of renewables, dependable generation, storage and interconnection—not just more installed capacity.

2/ Data centres need reliable 24/7 electricity. Like other large industrial users. Keeping them online requires firm energy, balancing, frequency control, inertia, voltage support and grid reinforcement. These are real costs, not accounting details.

3/ Enter the cap-and-floor model. Revenue floors can reduce interconnector investment risk; caps limit retained revenues under the scheme’s rules. But who ultimately bears the downside, and who benefits from the upside? And they like to whiff of renewables and it’s proved a good business model.

4/ Merchant development fragments the system into privately financed assets: interconnectors, batteries, LDES and grid services. Each pursues its own revenue streams, while the electricity system must coordinate the whole. Revenue stacking can be efficient—but overlapping subsidies and socialised costs need scrutiny.

5/ Here’s the danger: private investors secure regulatory support, data centres secure the power they need, and households and SMEs may absorb part of the wider network and system costs through electricity prices and regulated charges. The actual allocation must be demonstrated, not assumed.

6/ Nuclear, wind, solar, storage and interconnection should be planned as one integrated system. Firm low-carbon generation can complement renewables; storage shifts energy through time; interconnectors share resources across borders. None replaces the need for proper grid engineering.

7/ If large energy users drive new infrastructure demand, they should bear an appropriate share of the costs. If the public helps de-risk private investment, consumers should receive transparent, measurable benefits in return.

The wolf in sheep’s clothing isn’t clean energy. It’s a fragmented development model that can privatise returns while spreading risks and costs across the public.

Ireland needs a dependable, low-carbon electricity system—not a blank cheque for investors or an assumption that households will pick up the tab. 🧵👇🧐

Just a few thoughts and observations.
2 replies 3 reposts 20 likes 1.5K views View on X
Prof Aoife M. Foley Verified account @AoifeMFoley
And just heard we need to use more modern construction methods. 🤣😂🥴 all from the @centralbank_ie
Prof Aoife M. Foley Verified account @AoifeMFoley Sep 11
Ireland’s infrastructure problem is not just about money now. It is about people.

The official National Development Plan is €275.4bn to 2035. If you add the wider regulated and semi-State programmes we have been talking about, the broader infrastructure envelope is of the order of €347bn. That is about €34.7bn a year, €95m a day, nearly €4m every hour and roughly €1,100 every second.

To put that into something more tangible, at an illustrative €150 per cubic metre, that hourly spend is the money equivalent of about 26,000 cubic metres of concrete, or around 3,300 ready-mix truckloads an hour. We are not going to spend it all on concrete, obviously. The point is the scale.

And money does not build anything on its own. People do.

Ireland has about 472,000 people across the public sector and about 196,000 in construction. But the specialist numbers are much smaller. An Coimisiún Pleanála had 268.2 WTE in 2024, with only about 100 technical staff. TII had 314 staff, around 99 of them engineers. Iarnród Éireann had 5,022 staff, with about 2,195 in infrastructure. Uisce Éireann has about 2,400 direct staff. The EPA had 508.4 WTE. Gas Networks Ireland has about 800 staff. ESB Group has more than 10,000 employees.

The 31 local authorities have about 32,274 WTE between them. Yet we still do not have one clean national figure for how many are planners, civil engineers, quantity surveyors, trades and other technical staff to really deliver on all of this. That is the real issue. Not total headcount. Specialist delivery capacity.

#EngineersIreland is warning of a shortage of up to 6,000 engineers and engineering technicians by 2030. Surveying is under pressure. Planning is under pressure. Environmental science is under pressure. Quantity surveying is under pressure.

And then there are the trades. Only 4,056 people completed traditional craft apprenticeships in 2025. Just 59 were women. Of those, 2,024 were electrical completions and only 31 were women. There were 561 plumbing completions and just 2 were women. There were 442 carpentry and joinery completions and none were women.

If we are serious about building homes, water, grid, rail, MetroLink, hospitals, schools, ports, airports and renewable energy, we need more people who can actually do the work. We need more electricians, plumbers, carpenters, plasterers, steel fixers, refrigeration technicians, welders, linespeople and cable jointers. We also need more civil, electrical, mechanical, structural and environmental engineers, more quantity surveyors, more town planners, and more environmental scientists and ecologists.

And this starts long before someone fills in a CAO form. It starts in school.

We need more pupils taking Higher Level Maths, Physics, Chemistry, Engineering, Construction Studies, Technical Graphics, Agricultural Science and Computing. Then we need enough college places and apprenticeship places to match what we are planning to build.

Because a four-year apprenticeship cannot fix a shortage next year. A four-year engineering degree cannot fix a shortage next year. A planning course cannot produce experienced planners overnight.

So we need a proper people plan beside the infrastructure plan. For every big programme to 2035, we should be able to answer a few basic questions. What are we building? How many engineers do we need? How many planners? How many quantity surveyors? How many environmental scientists? How many electricians, plumbers and other trades? How many do we have now? How many are in training? How many qualify each year? Where are the gaps? And how many are women?

Because one of the biggest untapped sources of capacity is sitting right in front of us. Women are around a quarter of engineering students, but only about 12 to 15% of the engineering workforce. In the traditional crafts, women were only 59 of 4,056 completions last year.

If we are serious about the National Development Plan, we have to be serious about the other half of the population.

Start in school. Make engineering and the trades visible. Open up more college and apprenticeship places. Help small firms take on apprentices. Make sites and careers work for women. And publish the skills numbers beside the spending numbers.

Ireland does not just need an infrastructure plan. It needs a people plan.