Twitxy Saved

BITMAIN

Verified account This account is verified. Learn more

@BITMAINtech

The world's leading manufacturer of digital currency servers through its brand ANTMINER.
bitmain.com Joined November 2013
414 Following 112K Followers 2.6K Posts

Latest posts 5

Pinned post

BITMAIN Verified account @BITMAINtech
🎤 WDMS Global 2026 — Official Launch

💡 BITMAIN has officially launched the latest-generation hydro-cooling miner — the ANTMINER S23 XP Hyd. at WDMS Global 2026, under the slogan "Revolutionizing Hydro-cooling Once Again," setting a new industry benchmark once again.

⚡ The S23 XP Hyd. achieves an energy efficiency as low as 8.9 J/T with a total hashrate of up to 600T, delivering further improvements in energy efficiency and operational stability — marking a new stage in BITMAIN's hydro-cooling technology and providing a more efficient and sustainable solution for large-scale data center deployment.

📅 Shipping is expected from November 2026 to January 2027.

🎫 Pricing and full specifications: shop.bitmain.com/product/detail…

🚀 Ride the Cycle. Hydro Prevails.
#BITMAIN #ANTMINER #WDMS #WDMS2026 #HongKong
6 replies 6 reposts 33 likes 8.6K views View on X
BITMAIN Verified account @BITMAINtech
🚀 BITMAIN heads to the 17th Blockchain Life Forum in Dubai!

📍 Booth A7 | Dec 1-2 | Festival Arena

New products on display:
🔹 ANTMINER S23 XP Hyd.
🔹 ANTMINER S23e U2H
🔹 ANTMINER Z15 Pro
🔹 ANTRACK AR21
🔹 ACS (ANTCOLDSTORAGE)
🔒 + a surprise product — stay tuned!

Join 15,000+ attendees from 130+ countries!

🎟️ Use promo code "BITMAIN" for a 10% discount on tickets!

#BITMAIN #ANTMINER #BlockchainLife
3 replies 1 reposts 15 likes 3.3K views View on X
BITMAIN Verified account @BITMAINtech
⏰Limited-Time Return: ANTRACK AR1901 & AR1902

👏Thank you for your continued support — AR1903 and AR1904 are sold out.
To give back to our customers, the AR1901 and AR1902 Hydro-Cooling Packages return for a limited time: ANTMINER S19 XP+ Hyd. computing servers inside each package at a special price of $1/T. Limited stock, while supplies last.

💦ANTRACK AR1901 Hydro-Cooling Package
ANTRACK AR1901 = ANTRACK AR21 + 4× ANTMINER S19 XP+ Hyd.
Total hashrate 1,172 TH/s | Total power consumption 24 kW | Leaving water temperature up to 50 °C
ANTRACK AR21 at $2,888 per set + 4× ANTMINER S19 XP+ Hyd. at $1/T = $4,060 per package.

💦ANTRACK AR1902 Hydro-Cooling Package
ANTRACK AR1902 = ANTRACK AR22 + 4× ANTMINER S19 XP+ Hyd.
Total hashrate 1,172 TH/s | Total power consumption 32 kW | Leaving water temperature up to 80 °C for high-temperature hot water
ANTRACK AR22 at $8,888 per set + 4× ANTMINER S19 XP+ Hyd. at $1/T = $10,060 per package.

⛏️Computing and heat recovery run in parallel — one investment, two outputs.*
* Power figures are based on manufacturer-rated specifications. Actual operating costs depend on your local electricity rates, facility conditions and operational practices and may vary. Heat recovery output depends on site conditions and ambient temperature. No guarantee of returns is made.
Sales start: November 13, 2026
Shipping: within 20 business days after payment
antrack@bitmain.com | bitmain.com
BITMAIN remains committed to consistently delivering better products and services to its clients.
0 replies 2 reposts 8 likes 3.2K views View on X
BITMAIN Verified account @BITMAINtech
ACS Cold Storage Solution: Cooling That No Longer Consumes Water

💧In hot, water-scarce, and high-water-cost regions, evaporative cooling depends on continuous make-up water, making water costs and usage quotas a real constraint on data center siting and operations. From water-demand reduction targets in the UAE and Saudi Arabia to tightened groundwater permitting in Arizona, water policies across the world's hot regions are steadily tightening.

🧊The ACS (ANT COLD STORAGE) cold storage solution uses a closed-loop design—no water is consumed during normal operation and no continuous make-up is required—shifting cooling from "constant water use" to "cooling stored in advance".

❄️In a full-year reference calculation for a 1 MW load, a conventional evaporative pad system consumes about 8,000 tons of water per year and a wet cooling tower about 9,000 tons, while the ACS-based solution requires zero make-up water. Each unit stores approximately 8 GJ of cooling capacity and provides about 6 hours of supplemental cooling for a 2 MW hydro-cooling container during peak hot hours. According to reference estimates, the investment pays back in roughly 2 years, depending on site climate, electricity, and water prices.

📒Note: Policy references are drawn from public government sources (UAE Water Security Strategy 2036, Saudi Qatrah program, Arizona Department of Water Resources announcements, etc.). Payback is an internal reference estimate and actual results vary with site conditions; not a guarantee of returns.

BITMAIN remains committed to consistently delivering better products and services to its clients.

#BITMAIN #ANTCOLDSTORAGE #ACS #ColdStorage #DataCenter #WaterSaving
BITMAIN Verified account @BITMAINtech
📡 BITMAIN has released the MFspec V3 Hydro-cooling Data Center Construction Solution — an in-depth guide for building efficient hydro-cooling data centers worldwide. 🌍

Covering five key sections — site selection, design, cost estimation, construction, and acceptance — the Solution leverages a standardized, modular approach designed to help you shorten construction cycles and reduce project costs, enabling you to deploy with confidence. 🏗️

Key highlights:

🔹 ANTSPACE HW7 modular design solution
🔹 Designed for diverse environments: -40°C to 50°C 🌡️
🔹 Full guidance from power systems to fire safety 🔧
📖 Read the full guide: bitmain.com/miningFarmCons…

Contact: mfspec@bitmain.com

BITMAIN remains committed to consistently delivering better products and services to its clients.

#BITMAIN #ANTSPACE #HydroCooling #DataCenter #MFspec
3:29