$VLTLF $LIB.v The lithium CapEx game has changed.
@LibertyStreamIP proved that a domestic #Lithium can be extracted in the US with a lower CapEx/OpEx
Just need the funds to deploy 10's of DLE units across the Permian & Bakken Basin & use the ready oil& gas byproduct!
@LibertyStreamIP proved that a domestic #Lithium can be extracted in the US with a lower CapEx/OpEx
Just need the funds to deploy 10's of DLE units across the Permian & Bakken Basin & use the ready oil& gas byproduct!
The CapEx gap in #lithium extraction is staggering.View quoted post on X
While $LAC faces a massive ~$3.83B CapEx just for Phase 1 of its centralized project, @LibertyStreamIP is proving there is a radically different way to scale $VLTLF $LIB.v
Centralized vs. Decentralized:
❌ LAC: Traditional, high-capital, massive standalone infrastructure.
✅ VLTLF: Modular deployment integrated into existing Permian Basin oil infrastructure.
By leveraging established networks like Select Water $WTTR, LIB bypasses the need for massive, standalone sites.
The math speaks for itself:
🔹 LAC Phase 1: ~$3.83B CapEx
🔹 VLTLF Unit: ~$37M CapEx (for 1,000 tpa) & keep multiplying the units.
This modular approach at existing water collection points directly de-risks the massive CapEx blowouts seen in centralized models. 🚀
It's about time that the US government & DoE wakes up & support the real domestic supplier that will starts delivering commercial lithium in 2027!