Latest posts 5
ESGold has signed a second MOU for the beneficial reuse of treated mining residue from the Montauban Gold-Silver Project, bringing total proposed annual aggregate supply to up to 500,000 tonnes.
The new agreement with Québec-based Gestion D.S. 50 Inc. covers up to 200,000 tonnes annually and builds on the Company’s October 29 agreement with Culture H. Dolbec Inc. for up to 300,000 tonnes per year.
This is an important step forward for the Montauban processing model.
ESGold’s operation is designed to recover gold and silver from historic tailings, then treat, neutralize and stabilize the remaining material for beneficial reuse as construction aggregate.
The Company is currently permitted to process up to 300,000 tonnes of historic tailings annually. With the two MOUs now representing up to 500,000 tonnes of proposed annual aggregate supply, ESGold is already seeing commercial interest that extends beyond the Project’s initial processing capacity.
The model continues to take shape: recover precious metals from material already at surface, process and stabilize what remains, and create a second commercial use for the residual material.
Read the full release here: esgold.com/esgold-expands…
CSE: ESAU | OTCQB: ESAUF | FSE: Z7D
#ESGold #ESAU #Gold #Silver #Mining #QuebecMining #Montauban #Reclamation
The new agreement with Québec-based Gestion D.S. 50 Inc. covers up to 200,000 tonnes annually and builds on the Company’s October 29 agreement with Culture H. Dolbec Inc. for up to 300,000 tonnes per year.
This is an important step forward for the Montauban processing model.
ESGold’s operation is designed to recover gold and silver from historic tailings, then treat, neutralize and stabilize the remaining material for beneficial reuse as construction aggregate.
The Company is currently permitted to process up to 300,000 tonnes of historic tailings annually. With the two MOUs now representing up to 500,000 tonnes of proposed annual aggregate supply, ESGold is already seeing commercial interest that extends beyond the Project’s initial processing capacity.
The model continues to take shape: recover precious metals from material already at surface, process and stabilize what remains, and create a second commercial use for the residual material.
Read the full release here: esgold.com/esgold-expands…
CSE: ESAU | OTCQB: ESAUF | FSE: Z7D
#ESGold #ESAU #Gold #Silver #Mining #QuebecMining #Montauban #Reclamation
For years, investors have heard what ESGold plans to build at Montauban.
Now the equipment is physically arriving on site.
Each delivery turns another part of the project from a plan into something tangible, and that matters as ESGold continues moving through installation, integration and commissioning.
The story is becoming easier to see: the infrastructure is real, the equipment is real, and Montauban is steadily advancing toward operations.
CSE: ESAU | OTCQB: ESAUF | FSE: Z7D
#ESGold #ESAU #Gold #Silver #Mining #Montauban #QuebecMining
Now the equipment is physically arriving on site.
Each delivery turns another part of the project from a plan into something tangible, and that matters as ESGold continues moving through installation, integration and commissioning.
The story is becoming easier to see: the infrastructure is real, the equipment is real, and Montauban is steadily advancing toward operations.
CSE: ESAU | OTCQB: ESAUF | FSE: Z7D
#ESGold #ESAU #Gold #Silver #Mining #Montauban #QuebecMining
0:14
ESGold has signed an MOU with Québec-based Culture H. Dolbec Inc. for the reuse of up to 300,000 tonnes per year of treated mining residue from the Montauban Gold-Silver Project as construction aggregate.
This adds an important new component to the Montauban processing model.
ESGold’s operation is designed to recover gold and silver from historic tailings, then treat, neutralize and stabilize the remaining material. Through this agreement, that treated residue now has a pathway toward beneficial reuse in construction applications.
The model is straightforward: recover precious metals from material already sitting at surface, process and stabilize what remains, and create a second use for the residual material.
Alongside the planned gold and silver recovery operation, this agreement opens the door to an additional revenue stream while advancing the reclamation of more than a century of historic mine waste.
Read the full release here: esgold.com/esgold-advance…
CSE: ESAU | OTCQB: ESAUF | FSE: Z7D
#ESGold #ESAU #Gold #Silver #Mining #QuebecMining #Montauban #Reclamation
This adds an important new component to the Montauban processing model.
ESGold’s operation is designed to recover gold and silver from historic tailings, then treat, neutralize and stabilize the remaining material. Through this agreement, that treated residue now has a pathway toward beneficial reuse in construction applications.
The model is straightforward: recover precious metals from material already sitting at surface, process and stabilize what remains, and create a second use for the residual material.
Alongside the planned gold and silver recovery operation, this agreement opens the door to an additional revenue stream while advancing the reclamation of more than a century of historic mine waste.
Read the full release here: esgold.com/esgold-advance…
CSE: ESAU | OTCQB: ESAUF | FSE: Z7D
#ESGold #ESAU #Gold #Silver #Mining #QuebecMining #Montauban #Reclamation
Montauban brings together three things that can take years for a mining project to secure: permits, processing infrastructure and material ready to be processed.
The historical tailings are already sitting at surface, giving ESGold a very different starting point than a conventional new mine.
The Company is advancing a fully permitted 1,000-tonne-per-day processing facility powered by Québec hydro, with major equipment continuing to arrive and more than C$20 million invested into the project.
The opportunity is straightforward: process material that was mined generations ago, recover the gold and silver that historical methods left behind, and move Montauban toward operations.
Permits in hand. Plant taking shape. Material waiting at surface.
esgold.com/investors/
CSE: ESAU | OTCQB: ESAUF | FSE: Z7D
#ESGold #ESAU #Gold #Silver #Mining #Montauban #QuebecMining
The historical tailings are already sitting at surface, giving ESGold a very different starting point than a conventional new mine.
The Company is advancing a fully permitted 1,000-tonne-per-day processing facility powered by Québec hydro, with major equipment continuing to arrive and more than C$20 million invested into the project.
The opportunity is straightforward: process material that was mined generations ago, recover the gold and silver that historical methods left behind, and move Montauban toward operations.
Permits in hand. Plant taking shape. Material waiting at surface.
esgold.com/investors/
CSE: ESAU | OTCQB: ESAUF | FSE: Z7D
#ESGold #ESAU #Gold #Silver #Mining #Montauban #QuebecMining
0:46