Twitxy Saved

Ministry of Water, Sanitation and Irrigation

Verified account This account is verified. Learn more

@MOWSI_KE

Vision: To ensure water resources availability and accessibility by all.
Maji House, Nairobi, Kenya water.go.ke Joined June 2017
356 Following 12K Followers 5.1K Posts

Latest posts 5

Ministry of Water, Sanitation and Irrigation Verified account @MOWSI_KE
Cabinet Secretary Ministry of Water Sanitation and Irrigation @mugaa_eric today convened a stakeholder Roundtable Meeting today to deliberate on the comments received regarding the draft Hydrologists (General) Regulations, 2026.

Discussions centred on the scope of practice in hydrology and the relationship between hydrology and hydrogeology. A key outcome of the meeting was the agreement to assess relevant course units. This assessment aims to clarify the academic training and qualifications required for recognition and registration as a hydrogeologist.

The engagement reaffirmed the Government’s commitment to inclusive stakeholder consultation, the strengthening of professional regulation, and the development of a robust regulatory framework that supports sustainable water resources management in Kenya.

The meeting brought together representatives from the hydrology profession, the Commission for University Education (CUE), the Hydrological Society of Kenya (HSK), the Water Resources Authority (WRA), the Geological Society of Kenya (GSK), the Ministerial Technical Advisory Committee (MTAC), the Ministry of Water, Sanitation and Irrigation, and the Hydrologists Registration Board (HRB).
Ministry of Water, Sanitation and Irrigation Verified account @MOWSI_KE
TURKANA WATER PROJECTS MOVE CLOSER TO IMPLEMENTATION FOLLOWING COMPLETION OF KEY ASSESSMENTS

Communities across Turkana County are a step closer to improved access to safe and reliable water following the completion of feasibility studies, environmental and social assessments for the Drought Resilience Programme in Northern Kenya (DRPNK) for the Third Annual Implementation Plan (AIP 3).

The assessments covered 14 proposed projects across four clusters – Lodwar, Loima, Kakuma and Kalokol – comprising 11 boreholes, one irrigation scheme, one water pan and one livestock market.

Led by the State Department for Irrigation in collaboration with County Government of Turkana and ISC GOPA Consultants, the exercise assessed the technical feasibility, environmental and social impacts of the proposed investments through field surveys and community consultations.

Findings revealed strong community support for the projects due to the projects potential to improve livelihoods through availability of water for domestic use, livestock and agricultural production. However, the team identified outstanding technical and environmental safeguards that must be addressed before implementation.

Key proposed investments include the Kaemase Irrigation Project in Loima, which has the potential to support approximately 500 acres under irrigation, with the first phase targeting 100 acres. The 11 proposed boreholes are expected to benefit approximately 35,000 people, public institutions and more than 100,000 cattle and goats.

The programme also proposes developing Nalet Water Pan in Songot Ward, with an ultimate storage capacity of 750,000 cubic metres. Its initial phase targets 50,000 cubic metres, alongside solar-powered pumping, water storage and distribution infrastructure, livestock watering points and fodder production facilities.

Community consultations highlighted the urgent need for these interventions, with residents citing prolonged dependence on saline water for household and livestock use. Turkana County Chief Officer for Agriculture, David Namus Maraka, observed that the investments would ease the burden on households and livestock farmers particularly during prolonged dry seasons.

The assessments also identified concerns relating to grazing land, vegetation, land use and resource sharing, particularly around the proposed Kaemase irrigation project. Other challenges included insecurity, poor road access and limited baseline information.

The close-out meeting recommended enhanced community engagement, particularly through local administration and community committees, as well as strict implementation of environmental and social safeguards throughout the project cycle. The technical team was given three weeks to finalize the project designs, environmental and social assessment reports.

Funded by the German Government through KfW, DRPNK seeks to strengthen drought resilience and improve livelihoods in northern Kenya through sustainable water infrastructure and related investments.

With the feasibility and safeguard assessments concluded, the programme is moving closer to the next stage of implementation, bringing Turkana communities closer to improved water security, stronger livestock production and expanded livelihood opportunities.

ENDS.....
Ministry of Water, Sanitation and Irrigation Verified account @MOWSI_KE
Launch of the Rio Change Makers the Sidelines of COP31

Today, Principal Secretary, State Department for Irrigation, CPA Ephantus Kimotho, joined representatives of the Landscape Alliance and the Global Landscapes Forum (GLF) at COP31 in Antalya, Türkiye, for the launch of Rio Change Makers, an innovative AI-enabled global marketplace developed through a partnership between the Government of Luxembourg and the Global Landscapes Forum.

The platform was officially launched by H.E Serge Wilmes, Minister for the Environment, Climate and Biodiversity, Government of Luxembourg.

The Principal Secretary represents the Government of Kenya on the Board of the Landscape Alliance as an Ex-Officio Member, providing an important link between Kenya's national development priorities and the Alliance's global agenda on sustainable landscapes, climate resilience and investment mobilisation.

Rio Change Makers leverages Artificial Intelligence (AI), scientific data and independent verification to connect investors, climate funds and public financing institutions with credible climate and nature-based projects seeking investment.

The platform seeks to address a longstanding challenge in climate finance: bridging the gap between available capital and viable projects on the ground. It also supports locally led initiatives by facilitating project verification, investment readiness and matchmaking with potential financiers.

The initiative presents valuable lessons for Kenya as it implements the National Irrigation Sector Investment Plan (NISIP) 2025–2035 and operationalises the National Irrigation Informatics Centre (NIIC).

Harnessing reliable data, digital innovation and AI-driven investment matchmaking can strengthen project preparation, unlock innovative financing opportunities and accelerate private sector participation in irrigation development.

Kenya recognises that achieving its ambitious irrigation expansion targets requires more than public financing. It calls for innovative financing mechanisms, strategic partnerships and effective mobilisation of private capital to accelerate irrigation development, agricultural commercialisation and climate resilience.

The ultimate goal is to bridge the gap between investment opportunities and available capital, translating climate ambitions into tangible development impact.

The Principal Secretary was joined by Secretary Land Reclamation, Climate Resilience and Irrigation Water Management among other senior Government officials.

Ends....
Ministry of Water, Sanitation and Irrigation Verified account @MOWSI_KE
𝐏𝐒 𝐊𝐎𝐑𝐈𝐑 𝐂𝐎𝐍𝐕𝐄𝐍𝐄𝐒 𝐒𝐓𝐀𝐊𝐄𝐇𝐎𝐋𝐃𝐄𝐑𝐒 𝐓𝐎 𝐅𝐀𝐒𝐓-𝐓𝐑𝐀𝐂𝐊 𝐓𝐇𝐖𝐀𝐊𝐄 𝐌𝐔𝐋𝐓𝐈𝐏𝐔𝐑𝐏𝐎𝐒𝐄 𝐃𝐀𝐌 𝐃𝐎𝐖𝐍𝐒𝐓𝐑𝐄𝐀𝐌 𝐖𝐎𝐑𝐊𝐒

Principal Secretary State Department for Water and Sanitation, Julius Korir, CBS @JKorir_K this afternoon held a stakeholder engagement meeting with representatives from the State Departments for Irrigation and State Department for Energy to deliberate on the implementation of the downstream components of the Thwake Multi Purpose Water Development Program.

The project is being implemented in three phases, with Phase I comprising construction of the dam embankment, spillway, intake tower, diversion tunnels and other supporting infrastructure. This phase is currently 94.5% complete, marking significant progress towards the realisation of the project's full potential.

The engagement was convened to bring together key government actors who will spearhead the subsequent phases, which will deliver three major benefits: bulk water supply, 20MW hydropower generation and irrigation development covering up to 100,000 acres of land.

The meeting agreed on the commencement of preparatory activities to facilitate the transition to the downstream works. These will include updating the project designs, validating all project components, reviewing and updating Environmental and Social Safeguards documents, mobilising the requisite financing and developing an appropriate management framework to guide the operation and sustainability of the completed infrastructure.

PS Korir underscored the importance of coordinated inter-agency collaboration to ensure that all components are aligned, adequately prepared and implemented in a timely manner.

The Thwake Multipurpose Dam is a strategic national investment that will strengthen water security, support agricultural productivity, generate clean energy and stimulate socio-economic development across the region.
Ministry of Water, Sanitation and Irrigation Verified account @MOWSI_KE
𝐏𝐒 𝐊𝐎𝐑𝐈𝐑 𝐑𝐄𝐕𝐈𝐄𝐖𝐒 𝐒𝐈𝐘𝐎𝐈 𝐌𝐔𝐑𝐔𝐍𝐘 𝐃𝐀𝐌 𝐒𝐏𝐈𝐋𝐋𝐖𝐀𝐘 𝐒𝐋𝐎𝐏𝐄 𝐏𝐑𝐎𝐓𝐄𝐂𝐓𝐈𝐎𝐍 𝐃𝐄𝐒𝐈𝐆𝐍𝐒 𝐀𝐒 𝐂𝐎𝐍𝐒𝐓𝐑𝐔𝐂𝐓𝐈𝐎𝐍 𝐍𝐄𝐀𝐑𝐒 𝐂𝐎𝐌𝐏𝐋𝐄𝐓𝐈𝐎𝐍

Principal Secretary for Water and Sanitation, Julius Korir, CBS
, held a meeting with the National Water Harvesting & Storage Authority design team to review the proposed designs for the spillway slope protection works at the Siyoi Muruny Dam in West Pokot County.

The dam project entails the construction of a 30-metre-high cyclopean concrete dam, with a crest length of 193 metres and an embankment volume of approximately 63,000 cubic metres. Upon completion, the dam will impound 8.9 million cubic metres of water, significantly enhancing water security in the region.

Construction of the dam is progressing steadily, with the project currently at 95.5% completion and the embankment works approaching the finish line.

The spillway slope protection works are therefore critical in safeguarding the structural integrity and long-term safety of the spillway, particularly as impoundment is expected towards the end of this year. The review focused on ensuring that the proposed designs meet the required engineering standards and provide adequate protection against erosion and other potential risks during dam operation.
PS @JKorir_K emphasised the need to expedite the remaining works while maintaining the highest standards of quality and safety to facilitate timely impoundment.