Twitxy Saved

Malay Krishna

Verified account This account is verified. Learn more

@Malay4Product

Product & AI Coach | 10+ years of experience | Helping people land their dream jobs
Bengaluru, India ayuda.co.in/ai-builder Joined July 2023
22 Following 4.3K Followers 1.4K Posts

Latest posts 5

Pinned post

Malay Krishna Verified account @Malay4Product
If you've ever been stuck on the Outer Ring Road at 6 pm, this video should make you smile.

Let me explain.

The Outer Ring Road, or ORR, is a big loop around Bengaluru. The eastern part, from Silk Board to KR Puram, has become one of the most important office belts in India.

Some of the biggest tech parks in the city sit along it.

Bagmane, Embassy TechVillage, and many more around Bellandur, Marathahalli and Mahadevapura. Every day, a huge number of people travel to these offices.

And almost all of them go by road. Cars, cabs, bikes, buses and office shuttles, all crammed into the same lanes.

That's why Silk Board junction became famous across India as a symbol of Bengaluru traffic.

The Blue Line is a new metro line that runs along this stretch, and then goes all the way to the airport.

The full line is 58.19 km long and will connect Central Silk Board to Kempegowda International Airport.

It's being built in two parts.

The first part, called Phase 2A, is 19.75 km long, from Silk Board to KR Puram. It has 13 stations, including HSR Layout, Agara, Iblur, Bellandur, Marathahalli and Doddanekkundi. This is the ORR stretch.

The second part, Phase 2B, goes from KR Puram past Hebbal and on to the airport.

So what's happening right now?

Trial runs have begun. On November 7, a train ran from the Baiyappanahalli depot to Benniganahalli. On November 10, it went further, all the way to Doddanekkundi on the ORR.

One of the biggest remaining tasks is getting the signalling system fully working.

The Silk Board to KR Puram section is targeted to open around May 2027. The full line to the airport is expected by March 2028.

Now these dates have slipped before.

Construction started in August 2021, and earlier targets were missed. But seeing trains actually moving on the track means this is no longer just a plan on paper.

Also it connects to the rest of the network. At KR Puram, you'll be able to switch to the Purple Line. At Silk Board, to the Yellow Line towards Electronic City. Later, at Nagawara, to the Pink Line going south.

So someone from Jayanagar, Whitefield or Electronic City will be able to reach the ORR offices without ever touching that road.

And once the airport section opens, you'll be able to catch a flight without spending ₹1,000 or more on a cab, or worrying about missing it because of traffic on the way.

Companies are betting on it too, this month, Bengaluru company InMobi signed a ₹65 crore deal with the metro for the naming rights of the Iblur station on this line.

Bengaluru's metro is already 103.6 km long and carried more than 11 lakh people on its busiest day this year. Adding the ORR and the airport to that network could change how the entire city moves.

Companies may find it easier to bring people back to offices. Families may be able to live further out and still have a reasonable commute. And the ORR may stop being the place where everyone's evening disappears.

The trains are running. Now the push has to be to finish the signalling, clear the safety checks and open the line on time, without another round of delays.

For years, people in this city have joked about Silk Board traffic. This video is the first sign that, soon, they might not have to.
Blue line metro trial run, Bagmane Tech park Mahadevapura !!

@ChristinMP_
View quoted post on X
40 replies 73 reposts 1.1K likes 101K views View on X
Malay Krishna Verified account @Malay4Product
The Pink Line will change how Bengaluru moves once its trains go underground, and that step is finally close.

Let me explain.

The Pink Line is Namma Metro's north-south line. It runs 21.26 km from Kalena Agrahara on Bannerghatta Road to Nagawara on the Outer Ring Road, with 18 stations.

It comes in two very different pieces.

The southern piece is about 7.5 km of elevated track with six stations, from Kalena Agrahara to Tavarekere.

This is the part that opened last week. Prime Minister Modi Ji inaugurated it on 13 November, and it opened to the public on 14 November.

The northern piece is the one most of the city is waiting for. It is about 13.8 km underground, with 12 stations.

Dairy Circle, Lakkasandra, Langford Town, MG Road, Shivajinagar, Cantonment, Tannery Road and Nagawara are all on it.

MG Road is the Purple Line interchange. Cantonment is a railway station. Shivajinagar is one of the most crowded parts of central Bengaluru. Nagawara will connect to the Blue Line going to the airport.

Now, BMRCL, the company that runs Namma Metro, has asked for permission to remove a buffer barrier at the end of the elevated section.

That would let underground trial runs begin. BMRCL has not announced this itself yet and this line has a long history of missed dates.

The project was sanctioned in 2014. The first round of tenders in 2018 had to be cancelled because bids came in about 70% above estimates.

One contractor's elevated contract was terminated partway and given to another. Tunnelling started in 2020, and nine tunnel boring machines dug about 21 km of tunnels.

Even the elevated section slipped from March 2026 to May, then to 15 August, and finally to November.

But finally, the underground section is now targeted to open by May 2027, as per BMRCL.

It still needs platform screen doors, ventilation, cabling and signalling to all work together. New trains are arriving steadily. BEML had delivered 11 of the 23 Pink Line trains by October.

So, if you live in Hulimavu or JP Nagar and work near MG Road, once the underground opens, the journey becomes one straight ride.

And if you live in the north-east, near Nagawara, the Pink and Blue lines together will put both the city centre and the airport on your doorstep.

Next, BMRCL should publish a clear, station-by-station plan for the underground stretch, they should also share why each milestone slips when it does.

CMRS should take the time it needs though. And the Karnataka government and the Centre should make sure funds and approvals for the last pieces do not become the next delay.
0 replies 3 reposts 68 likes 6.5K views View on X
Malay Krishna Verified account @Malay4Product
The rupee is having its best month in eight years, despite losing $14 billion from forex reserves.

Before we understand this, let's understand forex reserves.

Forex reserves are the foreign money RBI keeps in its safe. RBI, the Reserve Bank of India, uses them to pay for imports in an emergency and to calm the rupee when it swings too much.

They come in four parts.

The biggest is foreign currency assets, mostly US government bonds and some euro, yen and pound assets.

Then there is gold.

The last two are small balances with the IMF, the International Monetary Fund.

RBI reports all of it in US dollars, every Friday.

For the week ending 13 November forex reserves were reported at $705.3 billion. That is $14.2 billion lower than a week before, and the lowest in about three months.

Foreign currency assets fell about $7.9 billion. Gold fell about $6.2 billion.

The gold part is the easiest to understand. RBI did not sell any gold. It holds 880.52 tonnes, as per RBI data from March, and it has denied rumours of gold sales.

International gold had its worst week since March, falling about 5%. Kitco shows it sliding from about $4,066 an ounce to about $3,884. Hotter US inflation data and bets on a US rate hike pushed it down.

Say RBI holds gold worth $100 on Monday. By Friday, the gold price is 6% lower. RBI still has every gram, but its gold is now reported as $94. The value of RBI's gold fell almost exactly that much this week, from $104.8 billion to $98.6 billion.

The currency part works the same way. Say RBI holds €100 when one euro buys $1.10. That counts as $110. If the dollar gets stronger and one euro now buys only $1.05, the same €100 counts as $105.

So nothing was sold, but $5 disappeared on paper.

This week the US dollar index hit a 20-month high. So every non-dollar asset RBI holds shrank when converted to dollars.

So why is the rupee so strong?

It closed at 92.68 to the dollar today, as per Business Standard. It has gained 2.46% in November, its best month since March 2017.

Foreign investors brought in nearly $13 billion this month. They sold dollars to buy rupees, which pushes the rupee up. Cheaper crude oil helped too.

Compare that with May, when the rupee hit a record low of about 96.8.

Now there is one more number worth knowing. Reserves touched an all-time high of $785.71 billion on 4 September. Today they are about $80 billion below that peak.

But is India still safe?

By RBI's own October bulletin, reserves covered 10.6 months of goods imports. The common rule of thumb is at least three months.

For us, a stronger rupee makes imported things cheaper. including phones, laptops, foreign tuition fees and holidays abroad.

So what should happen next?

RBI should use these strong inflows to quietly buy dollars and rebuild reserves, without stopping the rupee from finding its level. It should also keep shrinking that $239 billion forward book, so the headline number and the usable number move closer.

So the $14 billion drop was mostly gold getting cheaper and the dollar getting stronger.
Moneycontrol Verified account @moneycontrolcom 9h
#Business | Forex reserves fall $14.2 billion to $705.3 billion, lowest in over three months

The decline was largely driven by valuation losses in gold and foreign currency assets.

@jain_anupreksha reports:

Read More:
moneycontrol.com/news/business/…
View quoted post on X
2 replies 5 reposts 39 likes 5.5K views View on X
Malay Krishna Verified account @Malay4Product
Anyone who has boarded a Mumbai local will wince at this video. I still think automatic doors are the right move, but we need to build them around Mumbai's crowd.

Let me explain.

The Mumbai suburban railway is the city's lifeline. Around 80 lakh use the line every day.

That's more people every single day than the population of many countries.

For decades, these trains have run with open doors. In peak hours, people hang from the door frames because there is simply no room inside.

It has a terrible cost.

As per Government Railway Police data reported by The Indian Express, 525 people died falling from moving local trains in 2025. Across all causes, including crossing tracks, suburban deaths were 2,287.

More than six in a day.

The turning point finally came on 9 June 2025. Near Mumbra, commuters standing at the doors of two overcrowded trains, passing in opposite directions, fell onto the tracks. Five people died.

After that, Railway Minister Ashwini Vaishnaw Ji announced non-AC locals with automatic doors.

Mumbai already had trains like this, but only the AC ones.

But AC tickets cost more so most of Mumbai still travels in the crowded non-AC trains.

Also non-AC train with closed doors need air.

So the doors have louvred panels, slats that let air through even when shut. There are roof ventilators too, and vestibules so people can walk between coaches.

The first prototype ran trials in August on a 63-km stretch between Khajuraho and Mahoba. RDSO, the Railways' technical body, flagged problems and the rake went back to ICF.

Now the modified rake faces fresh tests of braking, suspension and the doors themselves, before it can get a fitness certificate.

See automatic doors have struggled in Mumbai before.

In a Western Railway trial in 2016 and 2017, the crowd kept blocking the doors and disrupted schedules. As reported by The Indian Express, CO2 inside peaked at 2,150 ppm against a 700 ppm limit.

The attempt cost about ₹75 lakh but never made it into regular service.

Then in 2025, Central Railway reportedly ran into overheating door motors and faulty sensors. So the engineering is hard, and the crowd makes it harder.

See in Mumbai, seconds add up. If every halt grows by a few seconds across dozens of stations, trains run late. The next train gets even more crowded.

So the doors on their own can't solve this. What solves it is more space for every person on the platform.

That means more frequent trains, longer rakes, and offices staggering their timings so the 9 am rush spreads out.

Chief Minister Devendra Fadnavis Ji has said AC coaches will eventually get automatic doors without a fare hike. That helps only if capacity grows alongside.

The Railways should also share trial results openly. How often did the doors reopen? How much longer were the halts? How did the air inside hold up? Mumbaikars deserve to see that before these trains carry passengers.

Until then, the safest thing a commuter can do is to let a packed train go when you can, and stay away from the door edge.

The man in this video, holding the doors open, is doing what Mumbai has always done. He's making room where there is none.
Indian Tech & Infra Verified account @IndianTechGuide 17h
🚨 Automatic doors on Mumbai local trains are struggling to cope with daily operations.
View quoted post on X
Malay Krishna Verified account @Malay4Product
If you hold ESOPs at an Indian startup, the most useful lesson from Anthropic's IPO is about timing.

Let me explain.

Anthropic is the company behind Claude, the AI assistant. It started in 2021. On 19 November, it listed on Nasdaq, the big American stock exchange.

It sold 980 million shares at $83 each and raised about $81.3 billion. Fox Business calls it the largest US IPO ever. The stock opened at $111.50, about 34% above the IPO price.

So why is everyone talking about the employees?

Because like most startups, Anthropic paid people partly in ESOPs. An ESOP, or employee stock option, is the right to buy company shares later at a fixed, low price.

As per Anthropic's documents reported by Reuters, options granted up to 2023 have an average exercise price of $0.52. Options granted in 2024 average $1.30.

The IPO price was $83.

Anthropic had about 5,300 employees in September, as per its filings. At the end of 2024, it had fewer than 1,000. CNN reports that about 5,100 of them, roughly 96% of staff, now hold equity worth more than $1 million.

Hill, a firm that advises tech workers on their equity, estimates that about 600 employees hold more than $100 million each.

Compare that with SpaceX, which listed in June. CNN reports it created about 4,400 millionaires from a staff of 22,000.

Anthropic did more with just a quarter of the people.

Usually, insiders can't sell for three to six months after an IPO. This is called a lock-up. It's basically a legal promise not to sell, so the stock doesn't crash from everyone dumping shares on day one.

Anthropic used a staggered lock-up.

Employees and other non-founder insiders could sell up to 10% of their shares from the first day. A further 35% opens up after the company releases its full-year 2026 financials.

So an engineer who joined in 2023 can turn a small slice into cash right now, and more over the next year.

Now compare this with India.

Under SEBI's rules, shares that employees already hold through ESOP schemes don't face the usual six-month lock-in after listing, as per legal summaries of the rules.

So once an Indian startup lists, its employees can often sell sooner than Anthropic's staff.

But the pain in India comes before the IPO.

Most ESOP holders wait years with no listing in sight. The only way to turn options into cash is an occasional company buyback.

But then there's tax.

In India, when you exercise your options, the gap between your price and the share's value is taxed like salary.

So you can owe tax on shares you can't sell yet.

Some eligible startups let employees defer this, but most companies don't qualify.

Assume an employee about to make 1 lakh from an ESOP share granted to them.

The share that is now worth ₹1,00,000 was offered to them at a base price of ₹10.

To access the share worth ₹1,00,000, you would need to pay tax on the difference (₹99,990) as if that was a salary.

For founders, the lesson is to grant generously to early employees, and give them a regular way to sell small slices before the IPO, through planned buybacks.

Even then, we need a complete reframing of ESOP laws to make it friendlier for employees opting for it.
Indian Tech & Infra Verified account @IndianTechGuide 20h
🚨 More than half of Anthropic’s 5,300 employees could become millionaires following the company’s IPO. 🙏
View quoted post on X