Twitxy Saved

BLR Metro Tracker

Verified account This account is verified. Learn more

@blrmetrotracker

Tracking The Status Of Implementation Of Metro Project In Bangalore Independently Since 2009
Bangalore blrmetrotracker.com Joined November 2025
14 Following 6K Followers 2.1K Posts

Latest posts 5

BLR Metro Tracker Verified account @blrmetrotracker
Sheet Changelog : 11-11-2026

NCC P1:
• Nagawara Station P7 R 1st Stage Pier Formwork Assembled
• HBR Station P6-P7 5x CCL IG Launched
• HBR Station P6-P7 2x PFL IG Launched
• AP290 L2 Tiebeam Formwork Assembled
• AP5 Pier Cap Launched
• AP35 Cast
• AP83L Cast
• AP253R 2nd Stage Being Tied
• AP330M Pile Excavated
• AP200R : L2 Being Tied

#Changelog
0 replies 1 reposts 25 likes 2.1K views View on X