Twitxy Saved

The Factitorium | Failure Analyst (unlicensed)

Verified account This account is verified. Learn more

@thefactitorium

Mechanical Engineer. Curious to a fault. Exploring the nuts & bolts of weird systems. Nature is scary, history is dumb, and I'm just here for the failures.
The Dept. of Unseen Systems Joined May 2025
150 Following 5.1K Followers 12K Posts

Latest posts 5

Pinned post

The Factitorium | Failure Analyst (unlicensed) Verified account @thefactitorium
This goes inside a cow. On purpose.

Dairy farmers have their cows swallow a magnet like this one, and it usually stays in there for life.

Cows barely chew. Nails and baling wire go straight down with the feed.

The magnet settles in the second stomach and grabs the metal before it can puncture anything.

To check if a cow already has one, the farmer holds a compass up to her.
The Factitorium | Failure Analyst (unlicensed) Verified account @thefactitorium
North America's first small modular reactor will be late and over budget. Its owner says the design isn't finished.

Ontario Power Generation is building a GE Vernova Hitachi BWRX-300 at its Darlington site east of Toronto. The first unit was supposed to cost C$7.7 billion and start commercial operation by October 2030. On Nov. 10, OPG said it will hit neither.

The reason it gave is engineering. The design for this first-of-a-kind reactor is still being finished while the plant goes up, and that ripples into construction and the supply chain.

That's the same problem that drove up US nuclear costs for decades. Big plants were close to custom builds, redesigned on site, so the learning never stacked up.

SMRs are supposed to fix that by building the same unit in a factory over and over. The first one still has to finish its drawings.
The Factitorium | Failure Analyst (unlicensed) Verified account @thefactitorium
They opened the crossfeed. It sent fuel from the left tanks straight out a leak in the right engine.

A wrong part fitted during maintenance had let a hydraulic line rub against a fuel line until it cracked.

The right engine quit over the ocean. Thirteen minutes later, so did the left. Captain Robert Piché, a glider pilot, glided the A330 for 19 minutes and about 65 nautical miles to Lajes in the Azores. All 306 survived.

Investigators found the crew had run the imbalance procedure from memory. The procedure now says to rule out a leak before opening the crossfeed.
The Factitorium | Failure Analyst (unlicensed) Verified account @thefactitorium 15h
You're the captain of an Airbus A330 over the Atlantic at night in August 2001, Toronto to Lisbon, 306 people aboard.

A warning says your fuel is out of balance. The right side is running low. The right engine's oil readings looked odd earlier too, and you've seen bad sensors before.

The standard fix is to open a valve and feed the low side from the full tanks.

Open the crossfeed, or treat it as a leak?
View quoted post on X
The Factitorium | Failure Analyst (unlicensed) Verified account @thefactitorium
You're the captain of an Airbus A330 over the Atlantic at night in August 2001, Toronto to Lisbon, 306 people aboard.

A warning says your fuel is out of balance. The right side is running low. The right engine's oil readings looked odd earlier too, and you've seen bad sensors before.

The standard fix is to open a valve and feed the low side from the full tanks.

Open the crossfeed, or treat it as a leak?
The Factitorium | Failure Analyst (unlicensed) Verified account @thefactitorium
Google just agreed to buy electricity from wells on the side of a volcano.

The deal is 50 megawatts from Quaise Energy's Project Obsidian, on the southern flank of Oregon's Newberry Volcano, starting as early as 2030. Newberry last erupted about 1,300 years ago.

The target is rock near 800°F. Above about 705°F and 3,200 psi, water stops being liquid or steam and turns supercritical, a dense fluid that carries far more energy. Quaise claims up to 10 times the power per well of normal geothermal.

The headlines are about a beam that vaporizes rock. That's planned for Phase 2. The first 50 MW gets drilled with ordinary bits.

As for setting off the volcano, Iceland ran that test by accident. In 2009 a well at Krafla hit magma 2.1 km down. Nothing erupted. It blew steam hotter than 840°F for about two years, until the valves on top failed.